Beckside, Whicham, Millom, Cumbria LA18 5LU

01229 772298

Millimetre Perfect!

The work on the Hayeswater hydroelectric scheme is drawing to a close with the inside of the power house ready for the installation of the turbines. Manchester Metrology, a specialist laser measuring company, were used to measure the position of the incoming flanged pipe and its relationship to the two reinforced concrete turbine plinths. It is critical that these are constructed to exact measurements to enable the installation of the twin turbines being used. Manchester Metrology’s report confirmed that the powerhouse has been constructed to specification with the actual measurements exceeding the very exacting tolerances required. A great achievement, well done to all the team who had a part in the construction.

Latest News

Joomla Templates and Joomla Extensions by JoomVision.Com

Breaking Ground for Beckside Dairy Development

Thursday 28th March marks the…

01 April 2019 - 7387 Views

UK Arla Farmers Become Full Co-Op Members

As an original supplier in…

12 February 2019 - 6165 Views

Using Genomics to Improve Dairy Performance

On 3rd December Beckside Farm…

11 January 2019 - 7814 Views

Beckside Dairy Development

Beckside Dairy Development Exciting new…

13 December 2018 - 14904 Views

Beckside

Beckside Farm, Whicham, Millom, Cumbria, LA18 5LU

by phone: 01229 772298

by e-mail: info@beckside.co.uk

or fill in the form on our contact page

Our Facebook Page